Give each part of the assortment a job
Start with the core seller, then set aside room for quicker-turning, premium and seasonal lines and a few test SKUs. Keep fast replenishment and stock availability in mind. Use whole carton quantities, MOQ, m³, gross weight and compliance status for each row.
UBII uses a 67 m³ planning limit for 40HQ. The example below budgets 65 m³.
Scroll sideways to see all columns.
| Role in the order | Budgeted cube | Selection criterion |
|---|---|---|
| Core range | 20 m³ | Proven repeat demand and reliable replenishment |
| Entry / impulse items | 13 m³ | Good carton density with an acceptable landed cost |
| Action and RC | 14 m³ | Sound feature and battery documentation |
| Seasonal range | 11 m³ | Shelf date and age or labelling agreed |
| Trial lines | 5 m³ | Use smaller approved carton quantities |
| Working allowance | 2 m³ | Late packaging changes or substitutions |
Turn a shortlist into a loading sheet
- Record MQ, carton quantity, units per carton, outer dimensions, gross weight and ready date.
- Calculate units, CBM and weight by row. Check both the total and any awkward carton, floor load or stacking limit.
- Order samples of the key selling lines first. Match each factory and version to the reports, markings and artwork for the country of sale.
- Agree which supplier sends each batch to the warehouse and at what cut-off. Use clear markings and check the location of fragile and heavy cartons.
- Send the final packed dimensions and tally to the forwarder for a physical loading check. Attach the approved loading list, packing list and invoice to the order file.
Use a quote to confirm what changed
The planner shows the sum of carton cubes and weights. Review substitutions, load restrictions and factory release dates with your team before treating a plan as a booking.
